Skip to main content

Gen Fyansford

A hole lot of water infrastructure

Key Achievement

Large volume of work and diversity of workExisting waterwayEnvironmental measures10km of pipework laid.

  • Location
    Geelong Region
  • Client
    Winslow
  • Industry Sectors Checklist
    Residential
  • Water Authority
    Barwon Water
  • Timing
    4 years - current
 

Successfully delivered 7 stages over 3 years and continuing.

Works include:

  • 6.1+kms sewer pipelines and 5.2+kms water pipelines
  • Large diamter pipes from 63mm to 375mm
  • 7m deep Pump station with 2 no. 130kL storage tanks 19m long.
  • 500+m of sewer rising mains
  • Pressure Reducing Valve Station
  • Large equipment used
  • Included crossing of a creek Moorabool River