Skip to content

Gisbourne to Sunbury Recycled Water Interconnector

July 13, 2023

3.8 km transfer pipeline and storage infrastructure to connect the Gisborne and Sunbury Recycled Water Schemes.

The completed distribution pipeline would transfer up to 1,100ML of recycled water from Gisborne Recycled Water Plant to the Parwan-Balliang Irrigation District via the Western Irrigation Network.

  • Traffic management – On existing road
  • Water pump station
  • 250 metres of boring
  • 3.8 km of 180ml recycled water main

← Back to News